Skip to content

Food production plant · İslahiye, Gaziantep

A food production plant in the industrial zone of İslahiye. The photos were taken in April 2026, before roofing: columns, prestressed roof girders and purlins are exposed, and the grid of the frame reads clearly from above.

Building type

Precast industrial building

Request a quote for a similar building
Precast concrete frame for a food production plant in İslahiye: columns, roof girders and purlins, with the industrial zone and mountains behind.1Precast column2Prestressed roof girder3Purlin
Photo
April 2026
Building
Food production plant
Location
İslahiye, Gaziantep
Stage in photo
Structural frame

Read the building

  1. Precast column
  2. Prestressed roof girder
  3. Purlin

Precast concrete frame for a food production plant in İslahiye: columns, roof girders and purlins, with the industrial zone and mountains behind.

Elements visible in the photos

Elements you can pick out in the photos. This is not the full scope of work; each element has its own page with dimensions and uses.

  1. Precast columnSits in a socket foundation and carries the roof girders, beams and wall panels.
  2. Prestressed roof girderSpans between columns in one piece and sets the roof pitch.
  3. PurlinLaid across the girders; carries the roof cladding.

From the site

Aerial front view of the food production plant: girders carrying the two-span roof and rows of purlins.
Aerial front view of the food production plant: girders carrying the two-span roof and rows of purlins. Photo April 2026
Top-down shot showing the grid of the precast frame and the rhythm of the roof purlins.
Top-down shot showing the grid of the precast frame and the rhythm of the roof purlins. Photo April 2026
Row of roof girders seen from inside the building, resting on columns with purlins between them.
Row of roof girders seen from inside the building, resting on columns with purlins between them. Photo April 2026
Prestressed roof girder stamped with the BETTON mark, with purlins and the valley behind it.
Prestressed roof girder stamped with the BETTON mark, with purlins and the valley behind it. Photo April 2026

Planning a similar building?

Send us the building type, province and rough dimensions; we will prepare your quote file with what we learned on similar projects.

CallRequest a quote